Project Logistics

Materials that arrive when the site is ready for them

On a construction project, a delayed or early delivery is a problem either way — sites have limited storage, tight access windows, and a build sequence that dictates exactly when steel, cement, aggregates, or equipment are needed.

Vyanex handles project cargo, over-dimensional consignments, and phased material supply with route surveys, permit coordination, and dispatch planning aligned to the site's construction schedule.

Access & road capacity

Approach roads, turning radii, and bridge limits verified before the load is booked.

Limited site storage

Quantities split across drops so the site never holds more than it can stage.

Narrow delivery windows

Dispatch timed to the site's permitted unloading hours and crane availability.

Heavy haul construction transport
Surveyed routes, escorted moves
Load Classes

Built for heavy and oversized cargo

Every consignment is matched to a load class before dispatch — the class decides the trailer, the escort, the permit set, and the route.

Class 01
FTL
Dedicated full-truck loads of cement, steel, sand, and aggregates.
Bulk material loads
Class 02
ODC
Girders, pipes, and structures beyond standard dimensional limits.
Over-dimensional cargo
Class 03
Heavy
Excavators, cranes, and plant moved on low-beds and multi-axles.
Plant & machinery
Class 04
Project
Multi-consignment supply sequenced against the construction programme.
Phased site supply
Solutions

Capabilities for infrastructure projects

Bulk material haul

Cement, steel, sand, and aggregates in dedicated FTL loads, dispatched from quarries, plants, and stockyards straight to the active site — with quantities split across drops when storage is tight.

ODC & over-dimensional

Girders, pipes, and pre-cast structures moved on the right trailer configuration, backed by route surveys, oversize permits, and escorted movement where the corridor demands it.

Plant & machinery

Excavators, cranes, and heavy equipment on suitable trailers.

Multi-site coordination

Movement across quarries, plants, and multiple project locations.

Scheduled site delivery

Dispatch timed to site access windows and build stages.

Permits & documentation

Oversize permits, e-way bills, and consignment records managed.

Common Questions

Construction logistics, answered

Yes. A route and access survey is done before dispatch, and ODC movements are planned with the right trailer, permits, and, where needed, timing around low-traffic windows.

Deliveries are sequenced against your build phases so materials arrive as the site needs them — avoiding both stockpiling and stoppages.

We coordinate oversize permits, e-way bills, and consignment documentation as part of the movement, so approvals don't hold up the load.

Yes. Multi-site programmes are planned as one dispatch calendar, so loads from a shared source are allocated across sites without clashing on vehicle availability.